STUDIO POLICIES
1. Project & Scheduling Policies
-
Lead Time Requirement
Minimum 4 weeks between deposit and project start. -
Scheduling Confirmation
Projects are secured only once the 50% deposit is received. -
Rescheduling Window
Any rescheduling must be requested at least 10 days in advance and is subject to availability. -
Project Duration Estimates
Timelines are estimates and may shift due to drying times, site conditions, or construction delays.
​​
2. Proposal & Estimating Policies
-
One Proposal Per Space
Each room/space requires its own proposal request form for accuracy and clarity. -
Measurement Requirements
Clients must provide accurate wall and ceiling dimensions; revised measurements may result in updated pricing. -
Complex Spaces
Nonstandard rooms (angled walls, bump-outs, vaults, beams, archways) may require on-site confirmation or additional charges.
​​
3. Deposit & Payment Policies
-
Deposit Requirement
A 50% non-refundable deposit is required to secure scheduling. -
Final Balance
Remaining payment is due upon project completion, prior to application of final sealers. -
Late Payments
Late fees begin after X days. -
Payment Methods Accepted
Credit card, ACH, check, or other agreed-upon methods.
​​
4. Sample & Color Approval Policies
-
Sample Turnaround
Samples ship within X days of receiving your deposit. -
Color Approval Requirement
Written approval of the sample is required before materials are mixed or scheduled. -
Sample Limit
One complimentary sample per approved surface; additional samples billed at $375 each. -
Color Matching Limitations
Colors are matched to the closest achievable hue within the constraints of each finish. -
Sample Approval Commitment
Once a sample is approved, it becomes the final design direction. All work, materials, and scheduling will follow the approved sample.
​​
5. Changes & Revisions Policies
-
Post-Approval Design Changes
Any design, color, or finish changes requested after sample approval require a formal change order, revised pricing, additional sample fees, and may impact the project timeline. -
Material Re-Creation
If custom materials or pigments have already been mixed, re-mixing or replacing materials due to design changes will incur additional material and labor charges. -
Changes After Work Has Begun
Any finish changes requested after application starts are treated as a new scope of work. The client is responsible for:-
All labor performed to date
-
Materials used to date
-
Any removal, resurfacing, or prep required
-
Full costs associated with producing and applying the revised finish
-
-
Mid-Project Change Order
No changes will be executed once work has started without a signed change order outlining scope, pricing, and timeline. Work pauses until written approval is received. -
Schedule Adjustments
Changes requested mid-project may require rescheduling. The project will be moved to the next available opening; rescheduling fees may apply. -
Non-Refundable Labor
Labor already performed is non-refundable and will be invoiced in full. -
Production Commitment
Once application begins, the finish is considered fully approved for production. Design changes require re-scoping via the studio’s change order process. -
Documentation & Approval
All changes must be confirmed in writing. Verbal approvals or on-site requests will not be acted upon until formally documented.
​​
6. On-Site Preparation Policies
-
Site Readiness Requirements
Walls must be:-
Smooth and properly prepared
-
Free of dust, debris, and active trades
-
Fully dry and primed (if required)
-
-
Protection & Access
-
Client must ensure access during agreed hours
-
HVAC must be functional
-
Owner/GC is responsible for covering adjacent surfaces and removing furniture unless otherwise arranged
-
-
Moisture Conditions
Excess moisture, leaks, or inadequate HVAC may delay work or damage finishes.
​​
7. Finish Behavior & Maintenance Policies
-
Handcrafted Variation
All finishes display natural movement and variation, which is part of the artistic quality—not a defect. -
Patchability
Finishes can be patched, but patched areas may remain visible. -
Cleaning Guidelines
Only gently blot with a damp microfiber cloth; abrasive cleaning voids your warranty. -
Sealer Behavior
Some sheen differences or color deepening may occur when sealing, depending on the finish.
​​
8. Warranty & Limitations
-
Limited Warranty
Covers adhesion and application quality; does not cover damage caused by:-
Furniture moving
-
Cleaning agents
-
Water intrusion
-
Improper maintenance
-
Construction-related issues
-
-
Natural Material Variation
Clay, lime, and plaster products contain inherent mineral shifts and movement. -
Environmental Exposure
Exterior or moisture-prone areas may develop natural patina or wear over time.
​​
9. Cancellation Policies
-
Before Scheduling
Deposits may be partially refundable depending on materials already purchased or mixed. -
After Scheduling
Deposits are non-refundable due to blocked studio time.
​​
10. Photography & Marketing Policies
-
Photo Rights
The studio reserves the right to photograph completed work for portfolio and marketing. -
Client Privacy
Client names and addresses are never disclosed.
​​
11. Designer & Trade Partner Policies
-
To-the-Trade Only
Projects must be designer-led; homeowners must be represented by a trade professional. -
Trade Discounts / Pricing
If applicable; otherwise, standard trade pricing applies. -
Collaboration Expectations
Designers must communicate final finish selections and color approvals before scheduling.
​​
12. Material Handling Policies
-
Custom-Mixed Materials
All materials are mixed per project and are non-returnable/non-refundable. -
Leftover Materials
Leftovers remain property of the studio unless otherwise specified.